Wednesday, 25 May 2011

Digging ever deeper

 The basement builders are making huge progress. The pit is getting ever deeper.

 Soon the two sides will meet and we will need a crossbridge to get out into the garden. To add to the chaos, Thames Water has hemmed us in from the other side with work in the street renewing their infrastructure. As the house trembles I am never quite sure which side the tremors are emanating from.
 The front garden remains a calm oasis in the midst of this carnage. My roses have put on a wonderful display, as has the philadelphus, and the tree with a name unknown to me.

On Friday we are expecting a camera crew to suprise us during the day, as they will be filming Caia. I had better get out the mops and dusters.

These photos do cheer me up.

Saturday, 14 May 2011

Roof matters

The dilemma of the week : whether to install photo-voltaic panels on the roof or integrated panels (these are much more aesthetically pleasing, but we wouldn't be able to fit as many in, and they are not quite as efficient).

Mini-dilemma: whether to install photo-voltaic cells or solar-thermal cells on the smaller bathroom roof.

We are going ahead with a local group scheme organised by Transition Town Re-furb group, which gives us a group discount. The group asked a number of companies to give estimates and have decided to go with local company Joju, who are very helpful, have wonderful computer-generated plans to show you the lay-out, and explain how much money you can expect to save through the Feed in Tarriff scheme.


Here is Chris with Dominic our architect on one of his site visits. 
Dominic looks pleased with the work.
Chris has just been cycling.




Digging in the foundations

A photo for Janek who loves dumper trucks

Tuesday, 10 May 2011

over the bank holidays

Before Easter, the back of our house was pulled down. This is how our garden looks at the moment.
The shed has been moved.
 The gates put on for delivery vehicles.
 Our new toilet.

Thursday, 28 April 2011

work has started


We have at last got a new bathroom - though not quite finished.
We are having 2 builders - Emil who is doing the basment and Jacek doing the new building works. Jacek's crew came in to install a bathroom at the top of the house. This had to be built before our bathroom in the extension was demolished - there was a bit of over lap when we didnt have anywhere to wish - but on the whole things went well.
It was Caia's birthday during the course of demolition works, but she and her friends had a great party on the scaffolding.  They put our rugs and pillows and had balloons, strawberries and chmapagne. The weather was great. That was before the rest of the house came down. Show you that later. Unfortunately I deleted a load of photos by mistake, that showed work in progress. Wait for more photos in next post.

Sunday, 13 March 2011

starting this week

I notice in my last blog, I said we were going to start in February, it is now 13 March and we are going to start next week. The first phase of work involves putting a bathroom in the top floor, so that we have somewhere to wash when the back extension and bathroom come down.
Last week Chris and I went to Ecobuild exhibition and were inspired. We now know a great deal more about PV cells, underfloor heating and rainwater harvesting, and these are basically the technologies that we want to install in the house during this refurb. Of course we also want to make sure that we have as much insulation in place as possible.Roof has been pretty much done, but under ground floor rooms will have to be done. It was good at Ecobuild because a lot of these technologies have moved on and we were able to have a lot of our questions answered.
This Saturday went to Chris Stevens and ordered all the stuff for the bathroom, basin & taps, shower tray, enclosure, shower head and taps, toilet, cistern and eco flush system.Believe me, it all mounts up. And then there were the tiles. Have spent about 10 hours looking in magazines, going to Chris Stevens, going to Topps Tiles, then back to Chris Stevens. Could not make my mind up - ordered some tiles, but not sure if they will be right. Main thing was to get porcelain instead of ceramic, as they are tougher. Hope it all looks OK.

Tuesday, 11 January 2011

heron in the garden


The big moment of my day was glancing out of the window and seeing a heron wading in our pond at the bottom of the garden. Makes me feel sad that all this will be destroyed and wildlife will be disrupted.
And here is the heron. Isn't that amazing?
Apart from that on a more mundane level:
  • party wall agreements are being sorted out
  • nursery behind has been approached for back-of-house access
  • agreement with builder being reached about basement & terms of contract etc.
  • Transition Town group looking to buy PV cells en-bloc
Looks as though we will start some time in February.

Dominic the architect has been brilliant in keeping things moving.

Saturday, 13 November 2010

designs completed (almost)

We had a relatively uneventful summer on the house front. A few meetings with Dominic and thrashing out ideas on details that all have to be agreed, such as which side will the sewage pipes come down on, siting of the ground floor toilet, lay-out of the basement space etc etc. It was all rather protracted, but at long last we have designs that we can submit to neighbours for approval and a specification to put out to tender.
Chris and I went to the Big Green Show in Swindon one week-end and of course were inspired by the products to amend the plans, but Dominic says as long as all contractors bit against the same spec that is all right.
I think after the 60 odd pages he produced of specs, he probably needs a break from our project for a bit.
Currently I am gathering quotes for placing PV panels on the roof. I would much prefer PV tiles to panels, for the aesthetics, but they come in at about double the price of the panels, and we have a lot of roof that is available for electricity generation.
Quandary here: should we go for PV everywhere or put solar thermal on the bathroom roof? Probably will just go for the PVs everywhere, as would have dual installation costs. At the moment we will get a paid substantially for any additional electricity we generate beyond what we use. there is apparently going to be a similar scheme for solar thermal panels in 2012 to encourage people to adopt this but cant be applied retrospectively. Also the solar thermal cells are bulkier and so even less attractive than the PV cells.

Next tasks: find window & door manufacturer, probably go to Poland for this, find garden designer, so that builders can do some of the groundwork.

I think things are going to get busy from now on!!