It is now over a year since we started the top bathroom. I cant believe how the time has flown. Since Christmas we have had a lot on our plates, with both of us getting back on track workwise.
Chris and Marlon working outside


Outside the drainage has been completed and the sunken patio dug out. Inside skylights have been put into the extension.
In the cellar meters have been moved to the back end and lots of cabling put in so that all TV , internet and phones can be used in many locations around the house.











A staircase has been put down into the basement so we no longer need to climb down using a ladder. We can now start to kit out the utility room. Life is gradually becoming more civilised.